DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›TSHD DC Orisant arrives at Orskov Yard for repair
Dredging

March 19, 2026 · about 6 months ago

TSHD DC Orisant arrives at Orskov Yard for repair

Reimerswaal Dredging’s trailing suction hopper dredger (TSHD) DC Orisant recently arrived at Orskov Yard for steelwork, engine installations, electrical repairs, and safety system maintenance. During dry dock periods, it’s crucial to efficiently carry out maintenance, repairs, and upgrades to keep o

1 minutes read
  • LinkedIn
  • X
  • Email
TSHD DC Orisant arrives at Orskov Yard for repair
photo courtesy of Orskov Yard

Reimerswaal Dredging’s trailing suction hopper dredger (TSHD) DC Orisant recently arrived at Orskov Yard for steelwork, engine installations, electrical repairs, and safety system maintenance.

During dry dock periods, it’s crucial to efficiently carry out maintenance, repairs, and upgrades to keep operating vessels on track, the Yard said.

Commenting the latest activities, the vessel’s captain, Dave van de Gruiter , added: “For a working vessel, time in dry dock is always a critical phase. Planning is tight, expectations are high, and delays directly impact operations.”

“What I particularly value about Orskov Yard is the flexibility. During any docking project, unforeseen or additional work inevitably arises. Another major strength is the wide range of services they can deliver together with their trusted partners. Having all these disciplines aligned and working efficiently together significantly contributes to a smooth docking period.”

Reimerswaal said that the DC Orisant is one of the few ships active in the market that features fully redundant design according to DP2 standards. In other words, all critical components and systems such as electric motors, pumps, generators and bow thrusters are duplicated.

The dredger is completely diesel-electric. All systems are equipped with electric motors and the six generators are controlled by an advanced power management system (PMS). This results in optimum fuel economy and minimizes CO2 emissions.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1The largest annual dredging work on Great Lakes in full swing
  2. 2Pacific Dredge completes Port of San Diego dredging
  3. 3Ellicott delivers another Mud Cat to Canada
  4. 4Dredging work underway near Lancelin jetty

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free