Pacific Dredge & Construction (PDC) has completed maintenance dredging at the B Street and Broadway Pier Cruise Ship Terminals with the Port of San Diego.
Utilizing the PDC 180 dredge, crews performed precision knockdown dredging between Broadway Pier and B Street Pier, as well as along the north side of B Street Pier.
Working within strict environmental requirements - including the use of a double silt curtain - and around an active cruise ship schedule, PDC successfully completed the work to the required design depths.
