DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›J.E. McAmis commissions new ABS Derrick Barge, the Ellis Island
Equipment

June 2, 2025 · about 1 year ago

J.E. McAmis commissions new ABS Derrick Barge, the Ellis Island

J.E. McAmis has announced the commissioning of the newest ABS Derrick Barge “Ellis Island” with design by Glosten and retrofitting by WCT Marine & Construction, Inc. in Astoria, Oregon. The 250′ x 76′ barge was upgraded with spudwells and 2 x 100′ x 36″ x 36″ high-strength spuds (designed for use wi

1 minutes read
  • LinkedIn
  • X
  • Email
J.E. McAmis commissions new ABS Derrick Barge, the Ellis Island
Photo courtesy of Scott Vandegrift/J.E. McAmis

Share this article

J.E. McAmis has announced the commissioning of the newest ABS Derrick Barge “Ellis Island” with design by Glosten and retrofitting by WCT Marine & Construction, Inc. in Astoria, Oregon.

The 250′ x 76′ barge was upgraded with spudwells and 2 x 100′ x 36″ x 36″ high-strength spuds (designed for use with large excavators), 390 Manitowoc drawworks in the spud winch, reinforced deck including new bulkheads and structure, and 18″ wear deck.

The barge has a Manitowoc 4100 support crane on board, along with a new CAT 6020 (6030 cylinders) excavator equipped with a 95′ Pierce Pacific front, Telestra Technologies Positioning, Esco Buckets, and CAT Ripper Shanks.

The barge (with available ramp) is large enough to travel remotely with all primary equipment, plus secondary equipment (loaders, etc.), and still have capacity for 2,000 tons of aggregate on board.

The Ellis Island will call on Dutch Harbor, AK, this summer for the Army Corps’ Alaska District and then work on a dredging and rock placement project for PND Engineers and the City of Unalaska.

The rig will wind up back on the Columbia River in early fall, where it will begin pile demolition and rock placement for the Sand Island and Baker Bay Pile Dike Projects.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free