DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business development›DEME Group: Oosterweel project moves ahead
Business development

May 4, 2025 · about 1 year ago

DEME Group: Oosterweel project moves ahead

The first tunnel element of the Scheldt Tunnel is floating up in the construction dock in Zeebrugge, Belgium – a feat of precision engineering of the TM COTU team (DEME Group, Besix, Jan De Nul Group and Stadsbader Contractors, for their client Lantis), as 60,000 tons of concrete must be balanced to

1 minutes read
  • LinkedIn
  • X
  • Email
DEME Group: Oosterweel project moves ahead
Photo courtesy of DEME

The first tunnel element of the Scheldt Tunnel is floating up in the construction dock in Zeebrugge, Belgium – a feat of precision engineering of the TM COTU team (DEME Group, Besix, Jan De Nul Group and Stadsbader Contractors, for their client Lantis), as 60,000 tons of concrete must be balanced to within a centimeter. “ Since mid-April, all eight tunnel elements have been lying underwater, held down by five ballast tanks each. Now, the tanks of the first element are being pumped out, allowing it to rise carefully to the surface ,” DEME said.

“After floating up, concrete is added inside the tunnel element at specific points to serve as ballast, ensuring it floats perfectly level. Meanwhile, excavation work is underway to open the dyke of the construction dock, carving out the passage the elements will use to leave the dock.” According to the current schedule, the first tunnel element will depart on May 19th for a 100 km journey via the North Sea and the Scheldt to Antwerp.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free