DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Flood Mitigation›Harder: $2.75M for flood control project to protect Stockton
Flood Mitigation

April 17, 2024 · about 2 years ago

Harder: $2.75M for flood control project to protect Stockton

California Representative Josh Harder said that that he secured $2.7 million for the Stockton Metropolitan Area Project Reimbursement which will go directly to the Lower San Joaquin River Flood Control Project. This Community Project Funding (CPF) will go towards completing this vital project to pro

1 minutes read
  • LinkedIn
  • X
  • Email
Harder: $2.75M for flood control project to protect Stockton

Share this article

California Representative Josh Harder said that that he secured $2.7 million for the Stockton Metropolitan Area Project Reimbursement which will go directly to the Lower San Joaquin River Flood Control Project.

This Community Project Funding (CPF) will go towards completing this vital project to protect Stockton from flooding.

In the greater Stockton area, 300,000 residents, critical infrastructure, and billions of dollars of property are exposed to potential flooding from the San Joaquin River, Calaveras River and Bay Delta.

The Lower San Joaquin River Flood Control Project is estimated to reduce annual property damage by 84% while improving security at 262 critical infrastructure sites, including 12 that are essential to public safety.

The project will include 23 miles of levee improvements and two closure structures, one at Fourteenmile Slough and the other at Smith Canal.

According to USACE, the levee improvements include cutoff walls, deep soil mixing (seismic), a new levee, levee geometry improvements and erosion protection.

Non-structural measures include nonstructural features, such as Comprehensive Flood Warning Emergency Evacuation Planning and Floodplain Management.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Flood Mitigation

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free