DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›Maintaining and protecting the Mississippi River
Equipment

October 26, 2022 · about 3 years ago

Maintaining and protecting the Mississippi River

The Mississippi River is one of the busiest waterways in the United States. Of its 4,267 miles of navigable channels (1/3 of U.S. inland waterways) 681 million tons of cargo move on the system each year with transportation cost savings of $12.5 billion. “Maintaining and protecting the Mississippi Ri

1 minutes read
  • LinkedIn
  • X
  • Email
Maintaining and protecting the Mississippi River
Ron Tuggle, USACE

The Mississippi River is one of the busiest waterways in the United States. Of its 4,267 miles of navigable channels (1/3 of U.S. inland waterways) 681 million tons of cargo move on the system each year with transportation cost savings of $12.5 billion.

“Maintaining and protecting the Mississippi River and other deep draft waterways is one of our key missions – and this is why our Dredge Hurley team is working as hard as they are,” USACE Memphis District said.

Most recently, the Hurley departed Beckwith (RM 925) on Oct. 19, arrived at their destination, Redman Bar, on Oct. 20, and immediately started dredging.

“Getting things done is what the Hurley team is all about – and they proved it at Redman Bar once again, as the channel was reopened on Saturday, Oct. 22, just two days after the Hurley arrived,” said USACE.

“They’re still dredging Redman Bar, outside of channel, as we currently have two locations (742 and 744) in this reach that (in conjunction with USCG) we were able to buoy around.”

Once these shoaling areas are dredged, Redman Bar will be about 850 feet wide through the reach river mile 740 – 744.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

EquipmentInfrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free