DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Littlehampton dredging campaign starts next week
Operations & Maintenance

October 24, 2022 · about 3 years ago

Littlehampton dredging campaign starts next week

The seasonal build-up of shingle overtopping the western breakwater into the harbour entrance (known locally as the “Shoal Bank”) is once again due for dredging in order to maintain safe access to the harbour for larger vessels. As reported by Littlehampton Harbour, on Monday 31st October, a 25-metr

1 minutes read
  • LinkedIn
  • X
  • Email
Littlehampton dredging campaign starts next week
WM Plant Hire

The seasonal build-up of shingle overtopping the western breakwater into the harbour entrance (known locally as the “Shoal Bank”) is once again due for dredging in order to maintain safe access to the harbour for larger vessels.

As reported by Littlehampton Harbour, on Monday 31st October, a 25-metre long reach excavator will commence dredging approximately 5,000 tonnes of shingle from the river and from the first bay of West Beach.

Part of this volume will be taken from the beach so as to reduce pressure (and mitigate risk of collapse) on the harbour’s ageing western wall which is due for replacement in the coming years.

Similar to the past biannual campaigns, the dredged shingle will be placed into a temporary stockpile at the top of West Beach. The shingle will from there be loaded into lorries by a second small excavator.

2,500 tonnes are set to go to East Beach Littlehampton to bolter coastal defences under Arun District Council’s management. The surplus (expected to be up to 2,500 tonnes) will go to the Angmering Park Estate Trust (the owner of the bed of the River Arun) and other local users.

Dredging from the river is expected to conclude within 1.5 weeks. Haulage away from the area will continue after dredging concludes. The intent is for the beach to be returned to its usual state no later than Friday 11th November.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free