DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Southwest Shipyard to build new crane barge for USACE
Infrastructure

October 12, 2022 · about 3 years ago

Southwest Shipyard to build new crane barge for USACE

The U.S. Army Corps of Engineers, Detroit District in concert with the Philadelphia District and the Marine Design Center recently awarded a $11.4 million contract to Southwest Shipyard LP of Houston, Texas, for a new crane barge on the St. Marys River. “The new crane barge will perform critical loc

2 minutes read
  • LinkedIn
  • X
  • Email
Southwest Shipyard to build new crane barge for USACE
USACE

The U.S. Army Corps of Engineers, Detroit District in concert with the Philadelphia District and the Marine Design Center recently awarded a $11.4 million contract to Southwest Shipyard LP of Houston, Texas, for a new crane barge on the St. Marys River.

“The new crane barge will perform critical lock and hydropower facility maintenance at the Soo Project Office (Soo Locks),” said Justin Proulx , Chief of the St. Marys River Section. “Additionally, the new vessel will support channel maintenance and will be ready to respond to critical maritime incidents on the St Marys River, such as vessel groundings and anchor drags.”

The final design, construction, testing and delivery of the Detroit District’s new crane barge are all part of the awarded contract. Southwest Shipyards is a small business and operates four shipyards along the Texas Gulf Coast. Southwest Shipyards intends to construct the new crane barge at their Brady Island shipyard with delivery expected in Fall of 2024.

The new crane barge will be 150 feet in length, have a beam of 50 feet, and a 10-foot molded depth, supporting a 220 U.S. ton lattice boom crawler crane. The new crane barge naming process will occur over the next few months.

The new crane barge will replace the daily functions of the Soo Project Office’s Crane Barge HARVEY, constructed in 1961, serving the Soo Locks and St. Marys River for over 60 years. The new crane barge will be slightly larger and is designed to meet the facility maintenance needs, to include the New Lock at the Soo, currently under construction.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

InfrastructureVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free