DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Calais Port 2015 project officially complete
Infrastructure

September 16, 2021 · about 5 years ago

Calais Port 2015 project officially complete

After six years of construction, the new Port of Calais was officially inaugurated on September 9, 2021. Considered as one of the largest European port infrastructure projects of the decade, the new port was inaugurated in the presence of Louis Le Franc, prefect of Pas-de-Calais; Xavier Bertrand, pr

1 minutes read
  • LinkedIn
  • X
  • Email
Calais Port 2015 project officially complete
spd-calais

After six years of construction, the new Port of Calais was officially inaugurated on September 9, 2021.

Considered as one of the largest European port infrastructure projects of the decade, the new port was inaugurated in the presence of Louis Le Franc, prefect of Pas-de-Calais; Xavier Bertrand, president of the Hauts-de-France region; Natacha Bouchart, Mayor of Calais, President of Grand Calais Terres & Mers; and Jean-Marc Puissesseau, President of the Societe d’Exploitation des Ports du Detroit.

Actual work on the Calais Port 2015 scheme began in September 2016 with the stone laying ceremony that was held in the presence of the French President, François Hollande.

Overall this capital development project included construction of a new 3 kilometer seawall; development of a basin covering 170 hectares; the construction of three new ferry berths and a roll-on/roll-off berth inside the harbor basin; new quayage which will provide the space required for the efficient integration of intermodal rail-road-sea infrastructure (Rail and Sea Motorways); 4 million cubic meters of dredging works; and development of new cross-Channel traffic reception capacities including parking facilities, roads as well as roughly twenty operational and reception buildings.

To read the whole story please click HERE !

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

InfrastructurePorts & Logistics

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free