DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Rosmorport completes Vanino dredging scheme
Operations & Maintenance

September 8, 2021 · about 5 years ago

Rosmorport completes Vanino dredging scheme

Far Eastern Basin Branch of the FSUE “Rosmorport” recently wrapped up another maintenance dredging project, this time it was the seaport of Vanino in the Khabarovsky region. According to Rosmorport, the works were carried out in the water area of berths No. 7 and No. 20 with the use of the company’s

1 minutes read
  • LinkedIn
  • X
  • Email
Rosmorport completes Vanino dredging scheme
Rosmorport

Far Eastern Basin Branch of the FSUE “Rosmorport” recently wrapped up another maintenance dredging project, this time it was the seaport of Vanino in the Khabarovsky region.

According to Rosmorport, the works were carried out in the water area of berths No. 7 and No. 20 with the use of the company’s own dredging fleet: the grab dredger Sakhalinets, and dredging barges Nevskaya and Slavyanskaya.

Prior to the Vanino scheme, dredger Sakhalinets was also used for the maintenance dredging works in the water area of the seaport of Vostochny, which were completed in late July.

The dredger is designed for excavation, extraction and loading of both heavy rock and light categories of soils at a depth of up to 30 meters.

During the works, the dredged material that was removed by the Sakhalinets was taken away to the underwater disposal area in the north-western direction between the Putyatina and Zeleny capes at the entrance to Sovetskaya Gavan Bay.

As a result of the dredging works, the depth of berths No. 7 and No. 20 was increased to 11.6 meters, which allows for safe approach and mooring of vessels with a draft of up to 10.8m.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free