DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business development›Callan crews busy at Bolivar Ferry Terminal
Business development

July 7, 2021 · about 5 years ago

Callan crews busy at Bolivar Ferry Terminal

Callan Marine is currently serving as the prime contractor to the Texas Department of Transportation for a maintenance dredging project located at the Bolivar Ferry Terminal. The project consists of the removal of 369,000 cubic yards of material and returning the landings to the required depth of 22

1 minutes read
  • LinkedIn
  • X
  • Email
Callan crews busy at Bolivar Ferry Terminal
Callan

Callan Marine is currently serving as the prime contractor to the Texas Department of Transportation for a maintenance dredging project located at the Bolivar Ferry Terminal.

The project consists of the removal of 369,000 cubic yards of material and returning the landings to the required depth of 22’.

The dredged material was hydraulically transported via 4,000’ of pipeline to placement area BU-1, located northeast of the dredging location.

The project is anticipated to be complete in mid-July by Callan’s fleet dredge the General Patton.

The General Patton is an 18” cutter suction dredge, 140’ in length with 3,000 total installed horsepower.

“Maintaining transportation routes is a priority for the Texas Department of Transportation,” said Micah Morris , Callan Marine’s Brown Water Divison Manager. “Callan Marine is proud to facilitate these projects with safety and integrity, completing projects quickly during peak summer travel months.”

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free