DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business development›Fishing Creek dredging plan unveiled
Business development

May 26, 2021 · about 5 years ago

Fishing Creek dredging plan unveiled

The USACE Baltimore District is planning to perform rehabilitation construction to the southern jetty and maintenance dredging for the Fishing Creek Federal navigation channel in Chesapeake Beach, Calvert County, Maryland. The proposed work consists of the rehabilitation of the southern jetty at Fis

2 minutes read
  • LinkedIn
  • X
  • Email
Fishing Creek dredging plan unveiled
chesapeakebeachmd.gov

The USACE Baltimore District is planning to perform rehabilitation construction to the southern jetty and maintenance dredging for the Fishing Creek Federal navigation channel in Chesapeake Beach, Calvert County, Maryland.

The proposed work consists of the rehabilitation of the southern jetty at Fishing Creek to a height of six feet mean lower low water (MLLW) using 1.5 to 3 ton capstone, which will reduce overtopping and ensure sediment does not pass through the structure.

This maintenance effort will restore the jetty elevations 2.7 feet higher than the original construction (NAVD88) and increase the jetty crest width to 16 feet.

Rehabilitation will be segmented into three sections with a total length of approximately 1,000 feet. A 75-foot wide by 10-foot deep MLLW channel parallel to the southern jetty will be dredged prior to access the site and perform the rehabilitation. Dredged material from the access channel will be placed at an existing nearby upland placement site.

The proposed work also consists of dredging the Fishing Creek channel to its authorized depth of seven feet MLLW, plus at least one foot of allowable overdepth, and a width of 100 feet.

USACE plans to hydraulically dredge approximately 22,000 cubic yards of material consisting of combinations of clay, mud, sand, silt, and shell. The dredged material will be placed via pipeline to the same upland site used for the access channel dredged material.

Earthwork berm repairs, to include possible raising of the existing berms, may be needed at the existing placement site.

The proposed jetty rehabilitation and maintenance dredging of Fishing Creek is being reviewed for environmental impacts in accordance with the National Environmental Policy Act (NEPA) of 1969.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free