DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Southsea piling work almost done
Operations & Maintenance

May 16, 2021 · about 5 years ago

Southsea piling work almost done

High winds and rough seas last week didn’t hinder the Southsea Coastal Scheme piling work, which is now within touching distance. According to the officials, the space between the rear and front pile lines is now clearly visible. Further to the west, the crews are excavating in sections between the

1 minutes read
  • LinkedIn
  • X
  • Email
Southsea piling work almost done
Southsea Coastal Scheme

High winds and rough seas last week didn’t hinder the Southsea Coastal Scheme piling work, which is now within touching distance.

According to the officials, the space between the rear and front pile lines is now clearly visible.

Further to the west, the crews are excavating in sections between the two pile lines in preparation for placement of the apron (sloping wall between front and rear pile lines) and promenade walls.

Section by section, the crews will be removing shingle and attaching a waling beam (horizontal beam fitted across the sheet piles to secure them) to the front pile line in order for the sloping apron wall to be fitted.

The officials also announced that all piling works on Frontage 1 (Long Curtain Moat) will be finished in the next couple of weeks.

The Southsea Coastal Scheme is a Portsmouth City Council project being delivered through Coastal Partners, with backing from the Environment Agency and UK Government.

The contractor for the scheme is VSBW, a joint venture between VolkerStevin and Boskalis Westminster. The partnership brings together two of the world’s leading maritime contractors; VolkerStevin focusing on marine civil engineering and Boskalis Westminster on dredging, land reclamation and marine construction.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free