DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Bagayevsky project celebrates milestone
Infrastructure

May 13, 2021 · about 5 years ago

Bagayevsky project celebrates milestone

Russian Federal Marine and River Transport Agency (Rosmorrechflot) has signed Acceptance Certificate for Phase 1 of the Bagayevsky hydrosystem project. The main aim of the Bagayevsky hydrosystem project is to solve the problems of navigation on the Volga-Don Waterway. According to Rosmorrechflot, th

1 minutes read
  • LinkedIn
  • X
  • Email
Bagayevsky project celebrates milestone
Rosmorrechflot

Russian Federal Marine and River Transport Agency (Rosmorrechflot) has signed Acceptance Certificate for Phase 1 of the Bagayevsky hydrosystem project.

The main aim of the Bagayevsky hydrosystem project is to solve the problems of navigation on the Volga-Don Waterway.

According to Rosmorrechflot, the acceptance certificate was signed for Phase 1 (the preparation period) of the Bagayevsky hydrosystem, after the commission finished its work on May 12, 2021.

The commission included representatives of Rosmorrechflot, Azov-Don Basin Administration, Stroytransgaz JSC (General Contractor) and Aquatic JSC (designer).

The construction works foreseen by the Federal Project “Inland Water Ways” under the Comprehensive Plan for Modernization and Expansion of Core Infrastructure (CPMI) till 2024 are divided into two phases.

The tender on construction of the Bagayevsky hydrosystem’s Phase 1 facilities (the preparation period) was won by Stroytransgaz in 2018.

The Phase 1 works included: building a berth for the construction base; construction of a navigable channel including dredging works at the berth; a yard for production/service/auxiliary facilities; temporary electric line, etc.

Once finished, the Bagayevsky project will solve the problems of navigation on the Volga-Don Waterway and water supply of the Rostov and Volgograd regions. The hydrosystem will provide guaranteed depth of the navigable pass on the Don river at 4 meters to ensure its availability for river-going ships, ships of mixed river/sea class and small sea-going ships.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free