DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Bayou Chene work underway
Infrastructure

July 20, 2020 · about 6 years ago

Bayou Chene work underway

Louisiana Governor John Bel Edwards has announced that the construction work is now underway on components of a permanent floodgate on Bayou Chene below Morgan City that will provide flood protection for portions of six parishes. The Coastal Protection and Restoration Authority (CPRA) and St. Mary P

1 minutes read
  • LinkedIn
  • X
  • Email
Bayou Chene work underway
CPRA

Louisiana Governor John Bel Edwards has announced that the construction work is now underway on components of a permanent floodgate on Bayou Chene below Morgan City that will provide flood protection for portions of six parishes.

The Coastal Protection and Restoration Authority (CPRA) and St. Mary Parish Levee District (SMLD) are overseeing construction of the automated barge floodgate. CPRA is directing $80 million from the Gulf of Mexico Energy Security Act (GOMESA) to fund the project.

The project was designed by several Louisiana-based engineering firms. APTIM Environmental & Infrastructure led the project with support from T. Baker Smith, Miller Engineers and Associates, and Eustis Engineering.

The area where the 403 foot floodgate will be located is currently being dredged and is expected to be completed by mid-September.

Louisiana-based Sealevel Construction, Inc. will fabricate and install the structure. The floodgate is currently being fabricated at Bollinger Shipyard in Amelia, Louisiana.

The floodgate and remaining components of the project, including road improvements, armored earthen levee, and a weir structure are all expected to be complete and operational by September of 2021.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free