DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›POAL seeks consent for deeper shipping channel
Infrastructure

June 24, 2020 · about 6 years ago

POAL seeks consent for deeper shipping channel

Ports of Auckland (POAL) has applied to Auckland Council for consent to deepen the city’s shipping channel and a resource consent hearing on the matter will be held next week. Auckland’s population is forecast to grow significantly, with a million more people expected to live here by 2050. More peop

2 minutes read
  • LinkedIn
  • X
  • Email
POAL seeks consent for deeper shipping channel
Ports of Auckland

Ports of Auckland (POAL) has applied to Auckland Council for consent to deepen the city’s shipping channel and a resource consent hearing on the matter will be held next week.

Auckland’s population is forecast to grow significantly, with a million more people expected to live here by 2050. More people means more demand for the products we all buy from overseas, which means more containerized imports and – bigger container ships and Ports of Auckland must be ready to handle this growth, POAL stated in their latest release.

The largest container ships calling in Auckland now carry up to 5,000 twenty-foot containers (TEU). Shipping lines want to bring 6-7,000 TEU ships here in the next 2-3 years and in future we will need to host ‘New Panamax’ ships that can carry around 12,000 TEU.

“The channel is currently 12.5 metres deep at low tide, but New Panamax ships are 366 metres long with a maximum draft of 15.2 metres. Ports of Auckland is only applying to deepen the channel to 14 metres – so how will the ships get in?” the statement reads.

The answer is tidal windows. In common use globally and at other New Zealand ports, a ‘tidal window’ simply means that deeper draft ships enter or leave port when the tide is high enough.

“To create a tidal window suitable for New Panamax ships to access port safely we will need a channel which is 14 metres deep on the straights and 14.2 metres deep on the bends. Our berth will be dredged to 15.5 metres so ships can stay through a full tide cycle.”

“The dredging will be done by the lowest impact method available – a digger on a barge. The digger will have a long arm to reach down to the seabed to scoop out material. The channel bed is mostly soft material like marine muds, mudstones and some sandstone and gritstone, which can be removed easily. No blasting is required,” Ports of Auckland said.

If consent is granted, work on deepening the channel could start in 2021.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free