DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›Restoring the Everglades with the help of Volvo
Equipment

May 26, 2020 · about 6 years ago

Restoring the Everglades with the help of Volvo

In the heart of the south of Florida, a giant hydrological restoration project is taking place. The construction of the C-43 reservoir is an important part of the federal Comprehensive Everglades Restoration Plan – to restore Florida’s Everglades water system. The plan is the largest hydrological re

1 minutes read
  • LinkedIn
  • X
  • Email
Restoring the Everglades with the help of Volvo
Volvo

In the heart of the south of Florida, a giant hydrological restoration project is taking place.

The construction of the C-43 reservoir is an important part of the federal Comprehensive Everglades Restoration Plan – to restore Florida’s Everglades water system.

The plan is the largest hydrological restoration project ever in the U.S.

Amongst other things, the project consists of the construction of an earthen embankment dam with a perimeter of approximately 26.2 kilometers and a separator dam of 4.5 kilometers in length, as well as 18 water control structures.

The C-43 reservoir work site is scattered with Volvo equipment, which is the key point for all heavy excavation and hauling and will eventually be deployed out on the dam and levy build.

The equipment includes a mix of A45 articulated haulers and excavators, as well as several EC750E excavators and wheel loaders, with more on the way.

The C-43 reservoir project is expected to be completed in 2023.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

EquipmentInfrastructureTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free