DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE to Build DMMA in Martin County
Business & Finance

May 20, 2020 · about 6 years ago

USACE to Build DMMA in Martin County

The U.S. Army Corps of Engineers, Jacksonville District has opened public comment on the Draft Environmental Assessment (EA) and proposed Finding of No Significant Impact (FONSI) for construction of a dredged material management area (DMMA) at Site O-23 located in Martin County, Florida. “Maintainin

2 minutes read
  • LinkedIn
  • X
  • Email
USACE to Build DMMA in Martin County
Image source: USACE

The U.S. Army Corps of Engineers, Jacksonville District has opened public comment on the Draft Environmental Assessment (EA) and proposed Finding of No Significant Impact (FONSI) for construction of a dredged material management area (DMMA) at Site O-23 located in Martin County, Florida.

“ Maintaining safe navigation on federal waterways is one of the Corps’ key missions ,” said Ashleigh Fountain, Project Manager . “ Construction of an additional Dredged Material Management Area in Martin County to provide adequate capacity for dredged material is an important step in preparing for the future maintenance needs of the Intracoastal Waterway and the Okeechobee Waterway .”

The Corps has prepared a Draft EA to assess environmental effects of the construction of a DMMA at the O-23 site in Martin County, Florida. The Preferred Alternative includes construction of a DMMA within the approximate 31-acre O-23 site to accept dredged material from maintenance of the Atlantic Intracoastal Waterway (IWW) or the Okeechobee Waterway (OWW).

Approximately 21 acres will be used for construction of the DMMA, of which, approximately 14 acres will be used for the confined disposal facility.

Currently, there is one DMMA for dredged material from the OWW, and limited capacity for the IWW north of the Stuart Causeway.

The proposed O-23 DMMA site is being proposed to handle the estimated shoaled material to be removed from portions of the OWW over the next 50 years.

Due to its relatively close proximity to the IWW (approximately 5 miles), the proposed O-23 DMMA site may also receive dredged material from portions of that waterway as well.

Public comment will be accepted through June 18, 2020.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free