DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›TV Dredging to Build Dredger for Hoftijzer Verhuur
Business & Finance

May 14, 2020 · about 6 years ago

TV Dredging to Build Dredger for Hoftijzer Verhuur

TV Dredging has been nominated by Hoftijzer Verhuur- en Aannemingsbedrijf to build a new deep suction dredger and booster pontoon. The new custom-build vessel will be used for sand extraction. The in-house engineered vessel – type TVD DSD 35 DE – will have a dredging depth of 37m. The main vessel me

1 minutes read
  • LinkedIn
  • X
  • Email
TV Dredging to Build Dredger for Hoftijzer Verhuur
Image source: hollandshipyardsgroup.com

TV Dredging has been nominated by Hoftijzer Verhuur- en Aannemingsbedrijf to build a new deep suction dredger and booster pontoon.

The new custom-build vessel will be used for sand extraction.

The in-house engineered vessel – type TVD DSD 35 DE – will have a dredging depth of 37m. The main vessel measures 20,00m long and 9,10m width. Measurements of the booster pontoon are 9,00m long and 3,50m width.

The totally installed generator power is 1690kW for powering of a 355kW jet pump, a 700kW submersible motor for the GIW underwater sand pump and 700kW motor for the booster pump.

‍TV Dredging has contracted MaRoTechniek as subcontractor for the electrical installation, dredge automation and winches. To ensure optimal efficiency, the vessel is equipped with PM motors, which contributes to lower energy consumption and reduces harmful emissions, the company said.

“‍To make sure (de)mobilization will be as efficient as possible, the vessel has a modular construction so it can easily be shipped anywhere by any means of transport; severely cutting transit time ,” according to their official announcement.

The vessel is expected to enter service in the second half of 2020.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  2. 2Stockton closes boat launch due to dredging work
  3. 3E-touch Dredgers: Work on new TSHD progresses steadily
  4. 4USACE begins Lower Charleston Harbor maintenance dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free