DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›All Set for Expansion Works at the Port of Sines
Business & Finance

February 13, 2020 · about 6 years ago

All Set for Expansion Works at the Port of Sines

Following the signing of the contract for the East Breakwater enlargement project, the expansion works of the Port of Sines will begin, thus allowing the port to double the containerized cargo installed capacity. The works concerning the extension of the Port of Sines’ East Breakwater were awarded t

1 minutes read
  • LinkedIn
  • X
  • Email
All Set for Expansion Works at the Port of Sines
Image source: Port of Sines

Following the signing of the contract for the East Breakwater enlargement project, the expansion works of the Port of Sines will begin, thus allowing the port to double the containerized cargo installed capacity.

The works concerning the extension of the Port of Sines’ East Breakwater were awarded to Conduril – Engenharia SA.

According to the port, with a total investment of approximately 72 million euros, the contract comprises the enlargement of the breakwater by 750 meters, which will allow to reinforce the protection of the east side of the Port of Sines, namely with regard to the next expansion phase of the Sines Container Terminal – Terminal XXI.

With the works set for conclusion during the first quarter of 2023, the extension of this protection infrastructure will create the ideal conditions for the simultaneous reception of four of the largest container carriers in operation in the world, with 400 meters of LOA (length overall).

Upon completion of this next expansion phase, Terminal XXI will double its installed capacity to 4.1 million TEU (1 TEU = 1 20-foot container), thus projecting its position in the international context, while enhancing its connectivity index to main world markets, in a wide offer.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Willapa Harbor dredging underway
  2. 2Dredging begins on Gugu River in Pampanga
  3. 3Boskalis Nederland: Work on Fish Migration River Afsluitdijk in full swing
  4. 4New sand arrives at West Beach and Henley Beach South

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free