DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Omaha District Completes Three Levee Repair Projects
Business & Finance

November 6, 2019 · about 6 years ago

USACE Omaha District Completes Three Levee Repair Projects

The U.S. Army Corps of Engineers, Omaha District, has completed repairs to levees damaged on three of the tributaries of the Missouri River ahead of schedule. The three projects totaling $707,000 were Pierce-North Branch of the Elkhorn River, Nebraska; Broken Bow-Mud Creek, Nebraska; and Ida Grove/O

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Omaha District, has completed repairs to levees damaged on three of the tributaries of the Missouri River ahead of schedule.

The three projects totaling $707,000 were Pierce-North Branch of the Elkhorn River, Nebraska; Broken Bow-Mud Creek, Nebraska; and Ida Grove/Odebolt Creek, Iowa.

According to Bret Budd, Chief of the Systems Restoration Team , the flood damage to the tributary levees consisted mainly of erosion of the river side of the levees from the high flows and also damage to the crest (top) of the levees for those levees that were overtopped.

“ With three tributary projects completed, and four under construction (Western Sarpy, Cedar Creek, Scribner and Columbus) at almost $10M, USACE has made significant progress on repairing damages from the March 2019 flood ,” he said. “ We still have 15 more levee repairs projects to award on tributaries. The majority of these projects have more severe damage that require more extensive engineering and design .”

Budd added that the Omaha District is being assisted by its sister districts in Walla Walla, Portland and Chicago with those four projects, and another four projects are being design by three different private engineering firms.

All fifteen of these projects are in the design stage; waiting for real estate; or waiting for levee cost-share funds on non-Federal levee systems.

The work at Western Sarpy, Cedar Creek, Scribner and Columbus, all of which are in Nebraska, is scheduled to be completed by April 2020.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Willapa Harbor dredging underway
  2. 2Dredging begins on Gugu River in Pampanga
  3. 3Boskalis Nederland: Work on Fish Migration River Afsluitdijk in full swing
  4. 4New sand arrives at West Beach and Henley Beach South

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free