DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Boskalis Wraps Up Cowes Gig
Business & Finance

October 28, 2015 · about 10 years ago

Boskalis Wraps Up Cowes Gig

Boskalis Westminster has just completed the installation of rock armor layers to the new detached Cowes Breakwater. The final handover of the breakwater to CHC will to take place next month. As agreed by Cowes Harbor Commissioners following the July 2015 project review, CHC has prioritized the compl

2 minutes read
  • LinkedIn
  • X
  • Email

Boskalis Westminster has just completed the installation of rock armor layers to the new detached Cowes Breakwater.

The final handover of the breakwater to CHC will to take place next month.

As agreed by Cowes Harbor Commissioners following the July 2015 project review, CHC has prioritized the completion and verification of a new tidal model with consultant hydrodynamic engineers ABPmer.

This new ‘overall’ tidal model covers an extensive area including all of the English Channel and parts of the North Sea, which is essential to more accurately simulate a wider range of tidal conditions within the area of interest in the Cowes Harbor and Solent ‘local’ model.

Comprehensive calibration reports for both the ‘overall’ model and the ‘local’ model have been completed; these detail the calibration and verification of the model against actual water levels and currents in multiple locations, both in the regional and local Cowes and Solent areas.

To provide additional assurance the modelling development and calibration reports have and continue to be reviewed and scrutinized by independent experts.

Sedimentation studies

Subsequent to the project review and in support of ABPmer’s July 2015 Sedimentation Report, Cowes Harbor Commission has, under its responsibility as Harbor Authority, committed to continuing to review all evidence and data to improve current understanding of the Cowes Harbor baseline sedimentation budget and its main drivers and sources (local, Solent and south coast environmental changes, natural and man-made interventions).

CHC is therefore set to commence a program of sedimentation sampling and monitoring throughout Cowes Harbor and the River Medina, designed to provide further information and data for ABPmer’s modelling program and also as part of a longer-term sedimentation-monitoring scheme for the harbor.

This monitoring program will combine a comprehensive bathymetric program and long-term sedimentation monitoring that will be used to assist the understanding of the sedimentation system and for the development of a new sustainable dredging management plan for the Medina Estuary.

Next phases of harbor infrastructure

The new ‘local’ tidal model will now be used to optimize the design of the next stages of planned harbor construction; the extension to the Sharpe breakwater, dredging of the new Eastern Channel and the basin for the Homes and Communities Agency proposed new marina in East Cowes.

The current program for all modelling works, design development and reporting still concludes with a timeline completing at the end of April 2016.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free