DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Works Continue on Roberts Bank Terminal 2
Business & Finance

September 2, 2015 · about 11 years ago

Works Continue on Roberts Bank Terminal 2

Port Metro Vancouver is continuing field studies as part of ongoing environmental and technical work for the Container Capacity Improvement Program. The Improvement Program was announced in 2011, and is Port Metro Vancouver’s long-term strategy to ensure the timely delivery of required infrastructur

1 minutes read
  • LinkedIn
  • X
  • Email

Port Metro Vancouver is continuing field studies as part of ongoing environmental and technical work for the Container Capacity Improvement Program.

The Improvement Program was announced in 2011, and is Port Metro Vancouver’s long-term strategy to ensure the timely delivery of required infrastructure to meet anticipated growth in the container sector.

Key objectives of the program:

The Roberts Bank Terminal 2 Project is a proposed new three‐berth container terminal that would provide 2.4 million twenty-foot equivalent units (TEUs) of additional container capacity annually. Port Metro Vancouver is undertaking a comprehensive multi-round, multi-year community, stakeholder and public consultation process regarding the project.

The project is undergoing a federal environmental assessment by an independent review panel, under the Canadian Environmental Assessment Act, 2012. The project is also undergoing an assessment under the British Columbia Environmental Assessment Act, and requires other permits and authorizations before it can proceed.

Here is an overview of field studies that will be taking place in September 2015: Biophysical Conditions; Biophysical Underwater Data Collection; Coastal Geomorphology; Abiotic Parameters Study; Geotechnical Conditions; Geotechnical Investigations; Marine Invertebrates; Orange Sea Pen Pilot Transplant Monitoring; Marine Sediment and Water Quality; Marine Water Quality Study; Marine Mammals; Marine Mammal Observation Study.

[mappress mapid=”21087″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free