West False River Barrier Project on Track (VIDEO)

Business & Finance

According to the Department of Water Resources (DWR), construction of a temporary emergency drought barrier at West False River in the Sacramento-San Joaquin Delta is its nearing completion.

The barrier now spans the approximately 750-foot-wide river between Jersey and Bradford islands and blocks salt water that tidal action attempts to push eastward from San Francisco Bay into Franks Tract.

The trapezoidal barrier is about 120 feet wide at its base and 12 feet wide at its top above the waterline. About 150,000 tons of rocks have been dropped from barges with hinged bottoms or lifted from barges and dropped by crane into the river’s channel to create the barrier.

[mappress mapid=”20589″]