DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen Dredging Package for TSHD Margaret Ann
Business & Finance

October 19, 2014 · about 12 years ago

Damen Dredging Package for TSHD Margaret Ann

Damen Dredging Equipment has delivered an instrumentation package for Trailing Suction Hopper Dredger “Margaret Ann”. The owner choice for the Damen instrumentation was obvious as they have various other TSHDs equipped with the same instrumentation operating to their full satisfaction. The delivered

2 minutes read
  • LinkedIn
  • X
  • Email

Damen Dredging Equipment has delivered an instrumentation package for Trailing Suction Hopper Dredger “Margaret Ann”. The owner choice for the Damen instrumentation was obvious as they have various other TSHDs equipped with the same instrumentation operating to their full satisfaction.

The delivered dredging instrumentation package comprises of various standard Damen instrumentation equipment. These include a Suction Tube Position Indication with both vertical and horizontal angle measurement, delivered for monitoring the position of the trailing pipe versus the vessel. On screen the side and top view of the pipe and TSHD are represented on one page accessibly.

Moreover, a Load and Draught indicator showing the vessels loading graph was mounted including the required pressure transmitters. Additionally the Tons Dry Solids are measured by radar sensors, indicating the cargo volume present in the hopper. Also, a Data Logger was installed combining the various signals plus time stamp and the location data taken from the newly installed Navguard positioning software.

All equipment was delivered and installed within 6 weeks. The owner Group De Cloedt’s Manager Special Projects Mr Jeffrey Wijnja says “ We contracted a job in Germany for the “Margaret Ann”. For that job this dredging instrumentation was vital. We chose the Damen dredging instrumentation as it runs on several of our TSHD’s to our full satisfaction. As the job had to be done without delay, the choice was easy. ”

The “Margaret Ann”, a 835 m3 TSHD of 85.9 m length, is on its way to its new job at this very moment.

[mappress mapid=”18948″]

Press Release

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free