DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Mystic River Dredging Deal Awarded
Business & Finance

October 5, 2014 · about 12 years ago

Mystic River Dredging Deal Awarded

Maintenance dredging of a portion of the Mystic River Federal Navigation Project in Groton and Stonington, Conn., will be completed under the terms of a $5.3 million contract recently awarded by the U.S. Army Corps of Engineers, New England District. The state of Connecticut is funding the dredging

2 minutes read
  • LinkedIn
  • X
  • Email

Maintenance dredging of a portion of the Mystic River Federal Navigation Project in Groton and Stonington, Conn., will be completed under the terms of a $5.3 million contract recently awarded by the U.S. Army Corps of Engineers, New England District. The state of Connecticut is funding the dredging project.

Work will be accomplished by Cashman Dredging and Marine Contracting Company, LLC, of Quincy, Mass. Construction is scheduled to start on or about Nov. 3, 2014 and will take about five months to complete. The contract was awarded on Sept. 30, 2014.

The Mystic River Federal Navigation Project in Groton and Stonington consists of: a 15-foot channel, 125 feet from the Sound up to the railroad bridge, then 100 feet wide up to highway bridge (U.S. Route 1); a 12-foot channel above the highway bridge to the upper wharves at the Seaport Museum; a 9-foot by 8.5-acre anchorage in the harbor north of Mason Island; and a 9-foot turning basin above the railroad bridge.

“ The work consists of maintenance dredging of up to 250,000 cubic yards of material from the Mystic River Federal navigation project ,” said Project Manager Jennifer Flanagan, of the Corps’ Programs and Project Management Division in Concord, Mass . “ The dredging will restore the channels and anchorage area to authorized depths. ”

The 12-foot channel was last maintained in 1941. Dredging of the other project features was last accomplished with the improvement work completed in 1957. A mechanical dredge will be used to remove shoals from all areas of the FNP and the material will be placed in scows and transported to the New London Disposal Site or the Rhode Island Disposal Site for placement.

The project will be managed by the Corps under the supervision of a Corps’ Quality Assurance Representative to assure compliance with contract requirements.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free