DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Dredge’s Success Cuts Olmsted Costs, Official Says (USA)
News

August 7, 2013 · about 13 years ago

Dredge’s Success Cuts Olmsted Costs, Official Says (USA)

The words “faster, better, cheaper” are sweet music to the ears of any serious steward of the taxpayers’ money, and this summer the Hurley delivered. “Historical dredging costs have averaged $16.75 per cubic yard, and the Hurley cost $6.41 per cubic yard,” explained Olmsted resident engineer Brad Br

1 minutes read
  • LinkedIn
  • X
  • Email

The words “faster, better, cheaper” are sweet music to the ears of any serious steward of the taxpayers’ money, and this summer the Hurley delivered.

“ Historical dredging costs have averaged $16.75 per cubic yard, and the Hurley cost $6.41 per cubic yard ,” explained Olmsted resident engineer Brad Bradley .

“ The cost savings on the material it removed from the dam construction footprint is well over a million dollars and that doesn’t count the savings from improving the schedule .”

It was the first time in the history of the project a dredge was used to clear the area on the river’s bottom where the dam shells would be placed.

The Louisville District regularly contracts for cutterhead dredges to keep the navigation channel open on the lower Ohio River.

The U.S. Army Corps of Engineers Dredge Hurley was chosen for it special features.

The 353-foot-long, 108-foot-wide dustpan dredge vessel is out of Memphis, Tenn. Its two 1,500-horsepower motors drive pumps that can remove as much as 5,000 cubic yards of sand and sediment from the river bottom each hour using a vacuum-cleaner type head and deposit it safely outside the navigation channel via a long floating pipeline.

It can dredge as deep as 75 feet if conditions require, which they did.

More info

[mappress]

Source: usace, By Jon Fleshman, August 7, 2013; Image: Jon Fleshman

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free