DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›MRGO Ecosystem Restoration Plan Available for Public Review (USA)
News

July 29, 2012 · about 14 years ago

MRGO Ecosystem Restoration Plan Available for Public Review (USA)

The Mississippi River Gulf Outlet (MRGO) Ecosystem Restoration Final Environmental Impact Statement and Feasibility Study report, which describes the plan for restoration of areas affected by the MRGO navigation channel, is now available for a 30-day public review through Aug. 27, 2012. The final re

2 minutes read
  • LinkedIn
  • X
  • Email

The Mississippi River Gulf Outlet (MRGO) Ecosystem Restoration Final Environmental Impact Statement and Feasibility Study report, which describes the plan for restoration of areas affected by the MRGO navigation channel, is now available for a 30-day public review through Aug. 27, 2012.

The final report, prepared by the U.S. Army Corps of Engineers, New Orleans District, outlines the Federally Identified Plan for restoring more than 57,000 acres of habitat within the MRGO ecosystem, a nationally significant area.

“ The Federally Identified Plan is designed to help restore the ecosystem affected by the Mississippi River Gulf Outlet, while restoring natural features that would reduce damage from storm surge, such as the East Orleans Landbridge. The team has put together an approximately $3 billion restoration plan that would protect and restore fresh, brackish and saline habitats, as well as cypress swamp, ridge habitats and oyster reef,” says Col. Ed Fleming, Commander of the New Orleans District.

The Federally Identified Plan (FIP) for the MRGO Ecosystem Restoration would benefit the Central Wetlands, Lake Borgne ecosystem and the Biloxi Marsh in St. Bernard Parish. Features outlined in the plan include the creation of marsh and swamp habitat through the placement of dredge material, planting swamp and wetland vegetation, protecting shorelines with rock breakwaters and creating oyster reef.

The features identified for construction in the FIP have been further divided into three tiers based on their dependency on freshwater input for long term sustainability. For example, features in Tier 1 do not rely on a freshwater diversion to meet anticipated ecosystem benefits. In addition, the FIP recommends that the implementation of a diversion of water from the Mississippi River near the community of Violet, La. to reduce salinity, and enhance wetlands and fishery productivity would require additional study through a separate authority before this feature could be constructed.

[mappress]

Dredging Today Staff, July 30, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free