DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›UK: Coastline Surveys Completes Two Vibrocore Campaigns for Hanson
Equipment

April 16, 2012 · about 14 years ago

UK: Coastline Surveys Completes Two Vibrocore Campaigns for Hanson

Coastline Surveys Ltd has recently completed two large Geotechnical Vibrocore campaigns for Hanson Aggregates Marine Ltd (HAML). The first work scope comprised 58 core locations offshore Norfolk. Specialist Geotechnical Survey Vessel, MV Flatholm, was mobilised and work scope completed with Coastlin

1 minutes read
  • LinkedIn
  • X
  • Email

Coastline Surveys Ltd has recently completed two large Geotechnical Vibrocore campaigns for Hanson Aggregates Marine Ltd (HAML).

The first work scope comprised 58 core locations offshore Norfolk. Specialist Geotechnical Survey Vessel, MV Flatholm, was mobilised and work scope completed with Coastline’s ‘High Powered Vibrocore, ‘C-Core-HP’, in 5m configuration, average recovery overall was 4 metres.

The second work scope comprised of 70 core locations, spread over four licence areas, offshore of Lincolnshire and North Norfolk, the furthest area being 27 miles off the North Norfolk coast. Overall, the work was completed port to port, Lowestoft, in less than 4 days with an impressive average recovery of 4m completed by the experienced team onboard.

This further demonstrates Coastlines unrivalled productivity rate and commitment to deliver an excellent product. The favourable weather allowed the vessel to remain on site overnight throughout the work scope, without requirement to return to port each evening.

Uniquely for a vessel of her size, this important ability reduces the likelihood of encountering poor weather (and therefore standby costs), maximises on-site time for the Client and reduces unnecessary steaming and fuel consumption – an increasingly important issue with new larger, higher powered (therefore high fuel consumption) vessels entering the market.

[mappress]

Dredging Today Staff, April 17, 2012; Image: Coastline Surveys

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

EquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free