DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Jan de Nul’s Dredger “Charles Darwin” Launched (Spain)
Business & Finance

June 11, 2010 · about 16 years ago

Jan de Nul’s Dredger “Charles Darwin” Launched (Spain)

On June 11th, 2010, twenty three months after placing the order, the trailing suction hopper dredger ‘Charles Darwin’ was launched at the shipyard Construcciones Navales del Norte in Sestao (Spain). The godmother of the ship was Charlotte Putz-De Nul, daughter of Mrs Ghislaine De Nul, sister of Jan

2 minutes read
  • LinkedIn
  • X
  • Email

On June 11th, 2010, twenty three months after placing the order, the trailing suction hopper dredger ‘Charles Darwin’ was launched at the shipyard Construcciones Navales del Norte in Sestao (Spain).

The godmother of the ship was Charlotte Putz-De Nul, daughter of Mrs Ghislaine De Nul, sister of Jan Pieter De Nul and Dirk De Nul, Directors of the company.

This new ship has a capacity of 30,500 m³ and with her limited draught of only 12 m and her length of 161.5 m, combined with 3 thrusters of 1,350 kW each, the vessel is very suitable to operate in shallow or confined waters. With a relatively low propulsion power of 2 x 10.800 kW, the speed in open sea will still be16 knots. This is the result of an optimized design of the hullform of the vessel and the use of specially designed propeller nozzles.This results in a low fuel consumption and lowered emissions. When the vessel sails with only 5 m under the keel, the speed will still be 14.1 knots.

Two suction pipes, equipped with submerged dredge pumps of each 3,400 kW are installed. Double-walled, electrically driven shore discharging dredge pumps with a total power of 15,000 kW will enable discharging the load at a high rate, over long distances.

Delivery is expected by the end of 2010. At the same shipyard, the TSHD ‘Leiv Eiriksson‘ was delivered. The ‘Leiv Eiriksson‘ is the sister vessel ‘Cristóbal Colón’, the largest trailing suction hopper dredger in the world.

[mappress]

Source: Jan de Nul, June 12, 2010

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free