DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›Tuttle Creek Lake dredging project starting this summer
Dredging

May 27, 2025 · about 1 year ago

Tuttle Creek Lake dredging project starting this summer

The U.S. Army Corps of Engineers and the contractors are making final preparations for a unique water injection dredging project at Tuttle Creek Lake. According to the Army Corps, the water injection dredging study and demonstration at Tuttle Creek Lake is set to begin this summer. The Kansas Water

1 minutes read
  • LinkedIn
  • X
  • Email
Tuttle Creek Lake dredging project starting this summer
Photo courtesy of USACE

Share this article

The U.S. Army Corps of Engineers and the contractors are making final preparations for a unique water injection dredging project at Tuttle Creek Lake.

According to the Army Corps, the water injection dredging study and demonstration at Tuttle Creek Lake is set to begin this summer.

The Kansas Water Office (KWO), in partnership with the Corps of Engineers and Michels Construction, will implement the Water Injection Dredging (WID) demonstration project at Tuttle Creek Lake to promote sustainable long-term reservoir sediment management.

WID is a process in which large volumes of water are injected at low pressure into the sediment bed near the bottom of the reservoir through the use of pumps and a series of nozzles located on a horizontal pipe positioned above the sediment bed.

The injected water effectively fluidizes the sediment creating a ‘ density current’ that allows the sediment to flow by gravity to deeper areas.

In the case of Tuttle Creek Lake, the proposed WID demonstration project is aimed at moving the sediment toward the existing low level outlet in the dam and monitoring the flow of the density current through the outlet during controlled discharges.

Successful demonstration of WID technology at Tuttle Creek Lake will help to advance other innovative methods aimed at extending the life of reservoir storage in Kansas, including the use of WID with hydrosuction or other sustainable sediment management techniques.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Precision dredging at Newton Ferrers by TMS
  2. 2Two months to go: get your ticket for OEEC 2026
  3. 3PHOTO OF THE DAY: Dredge Potter returns for 2026 dredging season
  4. 4VIDEO: Spotlight on $642M Oakland Harbor turning basins widening

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free