DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›Potter ready for another dredging season
Dredging

June 25, 2024 · about 2 years ago

Potter ready for another dredging season

The Dredge Potter, built in 1932, left the St. Louis service base dock last week headed to Grafton, Illinois to begin its dredging season. A crew of 53 highly-skilled employees from USACE St. Louis District staff the dustpan dredge that is capable of filling an Olympic sized swimming pool every hour

1 minutes read
  • LinkedIn
  • X
  • Email
Potter ready for another dredging season
Photo courtesy of Janet Meredith/USACE

Share this article

The Dredge Potter, built in 1932, left the St. Louis service base dock last week headed to Grafton, Illinois to begin its dredging season.

A crew of 53 highly-skilled employees from USACE St. Louis District staff the dustpan dredge that is capable of filling an Olympic sized swimming pool every hour.

USACE uses Dredge Potter to ensure safe navigation for commercial vessels on the Illinois and Mississippi Rivers. In 2023, drought conditions required the crew to move 6.3 million cubic yards of sand, silt, and clay from the river bottom at 31 different locations.

Over the past winter, the staff and crew completed routine maintenance and repairs at the Corps’ service base to prepare for this year’s dredging season.

Skilled tradesmen completed in-house repairs to critical components in the material pumping process. This included rebuilding the pump room gear box, pedestal bearing and head hoist block for lifting the dustpan.

Additionally, a quick release system was installed on the dredge disposal pipeline to make it safer for the crew to move material for disposal. Sleeping quarters and bathroom areas were updated as well, since last year’s dredging season.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

DredgingVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Dredging Africa presents new CSD
  2. 2Premier Marinas submits Brighton dredging application
  3. 3Dredging underway at Everett Harbor and Snohomish River
  4. 4PD Ports opens new Marine facility

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free