DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Beach Nourishment›Van Oord wraps up large-scale beach restoration project in Valencia
Beach Nourishment

April 15, 2024 · about 2 years ago

Van Oord wraps up large-scale beach restoration project in Valencia

Van Oord has completed the largest beach restoration in Spain’s history, restoring the beaches south of the city of Valencia to their original size. The beaches have been slowly eroding since 1965. The Spanish government contracted the joint venture of Van Oord subsidiary Dravo S.A. and Rover Mariti

2 minutes read
  • LinkedIn
  • X
  • Email
Van Oord wraps up large-scale beach restoration project in Valencia

Share this article

Van Oord has completed the largest beach restoration in Spain’s history, restoring the beaches south of the city of Valencia to their original size.

The beaches have been slowly eroding since 1965. The Spanish government contracted the joint venture of Van Oord subsidiary Dravo S.A. and Rover Maritime to restore 7 kilometers of coastline and to extend 2 breakwaters to reduce erosion.

Van Oord deployed its largest trailing suction hopper dredger, the HAM 318, to apply 3.3 million cubic meters of sand, extending the beaches up to 150 meters wide. The dredged material was pumped ashore over a distance of 1.8 kilometers, using a combination of floating and submerged pipelines.

Building with nature

The widened beaches protect low-lying coastal communities, agricultural areas and the Albufera National Park separating its fresh water from the salt water of the Mediterranean Sea.

Another part of the project was restoration of the dunes. A combination of sand, strategically placed sand collectors and newly planted vegetation form the basis of the new dunes. The sand collectors, made from a local type of cordgrass, are placed in squares to trap sand blown along by the wind.

Within those squares, the newly planted vegetation will firm up the forming dunes. In total 75.5 kilometers of sand collectors and 44,000 plants were placed to contribute to the overall ecological fortification of the area. The aim is not only to safeguard the natural environment, but also to enhance its ecological resilience.

“ Van Oord’s subsidiary Dravo S.A. looks back on the Valencia project with pride. Thanks to the expertise and commitment of the project team, the large-scale project has been successfully completed within budget and within the agreed execution period. The new beaches not only serve as coastal protection for Valencia, they also contribute to the restoration of the ecology within the area ,” said Jesus Martin Managing Director Dravo S.A.

NextGenerationEU

The Spanish Government financed the project via the European Commission (EC). The EC started the NextGenerationEU fund in 2021, a temporary instrument to support recovery from the COVID-19 pandemic and build a greener, more digital and more resilient future.

The fund means that members of the European Union have the opportunity to reform and invest in their countries. Part of this fund serves as a plan for recovery, transformation and resilience of coastal areas. The Valencia project, designed by the Ministry of Ecological Transition and Demographic Challenge, via the secretary of state for the environment and Valencia’s COSTAS office, met this pillar.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Beach NourishmentDredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  2. 2Puerto de Sevilla completes Guadalquivir dredging
  3. 3McLaughlin & Harvey appointed to Dover' Project Contractor Framework
  4. 4Oceanside Harbor dredging wraps up

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free