DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business development›BREAKING NEWS: Boskalis to deploy TSHD for Baltica 2 job
Business development

September 5, 2023 · about 3 years ago

BREAKING NEWS: Boskalis to deploy TSHD for Baltica 2 job

Boskalis has acquired two contracts for the transportation and installation of the export and array cables for the 1.5 GW Baltica 2 offshore wind farm off the coast of Poland. The two contracts were awarded by a joint venture between PGE Polska Grupa Energetyczna and Ørsted, which are developing the

1 minutes read
  • LinkedIn
  • X
  • Email
BREAKING NEWS: Boskalis to deploy TSHD for Baltica 2 job

Share this article

Boskalis has acquired two contracts for the transportation and installation of the export and array cables for the 1.5 GW Baltica 2 offshore wind farm off the coast of Poland.

The two contracts were awarded by a joint venture between PGE Polska Grupa Energetyczna and Ørsted, which are developing the Baltica 2 project.

“For this project, we will deploy two cable-laying vessels, a construction support vessel, a subsea rock installation vessel and a trailing suction hopper dredger ,” Boskalis said.

The work scope comprises the transportation and installation of 107 array cables with a total length of more than 150 kilometers in addition to four 275 kV export cables with a total combined length of nearly 300 kilometers.

“Furthermore, we will carry out seabed preparation activities including the leveling of the seabed, pre-trenching and the removal of boulders,” said Boskalis.

“Upon completion of the cable installation activities, we will protect and stabilize the cable protection systems with the placement of rock.”

Preparatory works will start in 2025 and the transport and installation activities are set to begin in 2027.

Due to challenging soil conditions in the Baltic Sea, the cables will be installed in a pre-cut trench using the multi-mode Megalodon plough deployed from Boskalis’ construction support vessel Falcon.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business developmentEquipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free