DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business development›Trelleborg seals for world’s longest immersed tunnel
Business development

September 28, 2021 · about 4 years ago

Trelleborg seals for world’s longest immersed tunnel

Trelleborg’s marine and infrastructure operation has won a contract to supply its tunnel seals to Femern Link Contractors (FLC) for the construction of the 18-kilometer long Fehmarnbelt tunnel. Connecting Denmark and Germany, once completed it will be the world’s longest immersed tunnel. Constructed

2 minutes read
  • LinkedIn
  • X
  • Email
Trelleborg seals for world’s longest immersed tunnel
Trelleborg

Trelleborg’s marine and infrastructure operation has won a contract to supply its tunnel seals to Femern Link Contractors (FLC) for the construction of the 18-kilometer long Fehmarnbelt tunnel.

Connecting Denmark and Germany, once completed it will be the world’s longest immersed tunnel.

Constructed from 79 large tunnel elements, each 217 meters long, and 10 special elements, the tunnel will comprise a four-lane motorway and two electrified rail tracks.

Richard Hepworth , President of Trelleborg’s marine and infrastructure operation, said: “Water tightness is integral to immersed tunnels, which require high-quality sealing products, in-depth engineering and application expertise. Trelleborg has an extensive track-record for delivering high-performing seals to immersed tunnels, in Europe and increasingly in Asia, where the market for various infrastructure projects is growing strongly.”

The Fehmarnbelt link will be built as an immersed tunnel between Rødbyhavn on Lolland and the German island of Fehmarn.

In contrast to a bored tunnel, an immersed tunnel is made up of hollow concrete elements, cast on land and assembled section by section to form the tunnel.

A trench for the tunnel must first be dug in the seabed in order to build the Fehmarnbelt link. This trench will be up to 60 metres wide, 16 metres deep and 18 kilometres long.

In total, some 19 million cubic metres of stone and sand will be excavated from the seabed. This will be used to establish approximately three square kilometres of new natural areas on Lolland and, to a lesser extent, on Fehmarn.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free