DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Maximizing facility utilization through dredging
Infrastructure

September 22, 2021 · about 5 years ago

Maximizing facility utilization through dredging

Through a competitive process based on merit, eligibility, and the availability of funds, the Port of Hueneme/Oxnard Harbor District was selected to receive a grant award totaling $5.1 million from the Economic Development Administration (EDA). This Department of Commerce’s EDA investment will provi

1 minutes read
  • LinkedIn
  • X
  • Email
Maximizing facility utilization through dredging
portofhueneme.org

Through a competitive process based on merit, eligibility, and the availability of funds, the Port of Hueneme/Oxnard Harbor District was selected to receive a grant award totaling $5.1 million from the Economic Development Administration (EDA).

This Department of Commerce’s EDA investment will provide long-term infrastructure enhancements to maximize facility utilization through dredging in Ventura County – a designated Opportunity Zone.

“This grant award and berth improvement project demonstrate our steadfast commitment to jobs and the environment, once again showing our ability to collectively foster economic growth and environmental stewardship,” said Oxnard Harbor District President, Jason T. Hodge.

The project includes dredging an additional five feet – from 35 ft. to 40 ft. to enable fresh produce container vessels to load heavier with each visit.

It also includes installing 600 ft. of sheet pile wall, demolishing old and installing new fender and mooring systems, repairing dilapidated areas of the concrete deck, and installing a passive cathodic protection system.

The berth located on the South Terminal at the Port is one that is also able to plug in oceangoing vessels into electric power, so they don’t run their engines while at berth.

By further improving such important infrastructure part of the harbor, this investment will help support further utilization of shore side power at the Port of Hueneme.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Bahrain plans major land reclamation at Khalifa Port
  2. 2Precision dredging at Newton Ferrers by TMS
  3. 3Two months to go: get your ticket for OEEC 2026
  4. 4PHOTO OF THE DAY: Dredge Potter returns for 2026 dredging season

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free