DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Boskalis versatile fleet in action (VIDEO)
Operations & Maintenance

September 6, 2021 · about 5 years ago

Boskalis versatile fleet in action (VIDEO)

Royal Boskalis Westminster N.V. (Boskalis) recently unveiled a video of the Öresund cable replacement project across the strait between Sweden and Denmark. The video titled “Öresund connection Denmark – Sweden” shows replacement of a total of 30 km of power cable within a restricted outage period. L

1 minutes read
  • LinkedIn
  • X
  • Email
Boskalis versatile fleet in action (VIDEO)
Boskalis

Royal Boskalis Westminster N.V. (Boskalis) recently unveiled a video of the Öresund cable replacement project across the strait between Sweden and Denmark.

The video titled “Öresund connection Denmark – Sweden” shows replacement of a total of 30 km of power cable within a restricted outage period.

Last year, Boskalis successfully replaced the ‘Öresund connection’ – four 400 kV high voltage alternating current (HVAC) cables across the Öresund. This power link plays an important role in maintaining the high transmission security of the two countries.

The project consisted of the design, production and installation of four 400 kV high-voltage power cables as well as the removal of the old system.

A number of specialized offshore and dredging vessels of Boskalis versatile fleet played an important role in this project: cable-laying vessel Spirit replaced the cables, backhoe dredger Nordic Giant dredged four trenches in the shallow parts of the route, cable-laying vessel Ndeavor buried the cables and fallpipe vessel Rockpiper installed the rock protection for the cables in the middle section of the route.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Dredging Africa presents new CSD
  2. 2Premier Marinas submits Brighton dredging application
  3. 3Dredging underway at Everett Harbor and Snohomish River
  4. 4PD Ports opens new Marine facility

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free