DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Construction activities in Sturgeon Lake starting soon
Operations & Maintenance

August 27, 2021 · about 5 years ago

Construction activities in Sturgeon Lake starting soon

The U.S. Army Corps of Engineers, St. Paul District, will soon begin construction activities in Sturgeon Lake in Pool 3 of the Mississippi River and at the Sturgeon Lake boat landing near Red Wing, Minnesota. According to the Corps, construction is expected to begin the week of Aug. 30, and will con

1 minutes read
  • LinkedIn
  • X
  • Email
Construction activities in Sturgeon Lake starting soon
USACE

The U.S. Army Corps of Engineers, St. Paul District, will soon begin construction activities in Sturgeon Lake in Pool 3 of the Mississippi River and at the Sturgeon Lake boat landing near Red Wing, Minnesota.

According to the Corps, construction is expected to begin the week of Aug. 30, and will continue through November.

The project, planned in collaboration with the Prairie Island Indian Community and the Minnesota and Wisconsin Departments of Natural Resources will restore floodplain habitat and enhance wetland habitat on Buffalo Slough Island, which is an 8-acre island located within Sturgeon Lake.

The project will beneficially reuse approximately 4,000 cubic yards of dredged material from the Mississippi River at Diamond Bluff and 8,000 cubic yards of material near the marina in Sturgeon Lake to raise the elevation of the Buffalo Slough Island by up to 2 feet.

The island improvements will increase the size of the island by approximately two acres, protect it from erosion and deflect the flow of the river away from the island.

These features are designed to restore the floodplain forest that once dominated the island, as well as create wetland habitat for migratory birds and other wildlife.

Due to ongoing construction activities for the project, the Sturgeon Lake boat landing will have limited parking Monday through Thursday but will be fully open to the public Friday through Sunday, concluded the Corps.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Dredging Africa presents new CSD
  2. 2Premier Marinas submits Brighton dredging application
  3. 3Dredging underway at Everett Harbor and Snohomish River
  4. 4PD Ports opens new Marine facility

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free