DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Technology›ABB, Van Oord: Continuous improvements in sustainability
Technology

March 23, 2021 · about 5 years ago

ABB, Van Oord: Continuous improvements in sustainability

Van Oord has signed a three-year agreement with ABB Turbocharging to provide fleetwide maintenance and optimization services. The agreement comes as two Van Oord vessels receive the first turbocharger upgrades of their kind in the dredger sector, saving thousands of tons in fuel and carbon emissions

2 minutes read
  • LinkedIn
  • X
  • Email
ABB, Van Oord: Continuous improvements in sustainability
Van Oord

Van Oord has signed a three-year agreement with ABB Turbocharging to provide fleetwide maintenance and optimization services.

The agreement comes as two Van Oord vessels receive the first turbocharger upgrades of their kind in the dredger sector, saving thousands of tons in fuel and carbon emissions over the next decade. The service agreement, which marks more than thirty years of cooperation between Van Oord and ABB Turbocharging, will help the owner minimize lifecycle costs and improve emissions across its fleet.

As well as offering full technical support and access to the latest turbocharger technologies and digital solutions, ABB Turbocharging will provide maintenance planning and budget control based on a ten-year strategic outlook.

“With fleet renewal underway and the IMO 2030 target approaching, we are jointly searching for continuous improvements in sustainability,” said Jorn Bertens, Category Manager Ship Management, Van Oord.

Andre Kreemer , Responsible Fleet Manager, Van Oord, added: “Technical support is more important than ever as we introduce new engine technologies to our fleet, and we are pleased to extend this cooperation with a trusted partner.” Van Oord’s largest trailing suction hopper dredging vessel was the first dredger to receive an upgrade to ABB’s TPL-A turbochargers. A similar upgrade will be performed on a second large dredger.

According to ABB, the two upgrades are projected to save thousands of tons in fuel and carbon emissions over the next decade. The TPL turbocharger component upgrade consists of improvements to several key components, including new compressor wheel and diffusor designs, improved turbine and nozzle ring, and optimized low friction bearings.

As well as significant fuel savings, the reduction in exhaust gas temperatures also improves reliability, resulting in lower maintenance costs and downtime.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Technology

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: Charlotte Amalie dredging starts next month
  2. 2Dredger picks up 150 kg German bomb off Belgian coast
  3. 3GLDD wins South Atlantic Regional Harbor Dredging Contract
  4. 4Meaford Harbor in-water dredging completes

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free