DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Flagler County Erosion Control Line Workshop on October 22
Business & Finance

October 3, 2019 · about 7 years ago

Flagler County Erosion Control Line Workshop on October 22

Flagler County, in coordination with the Florida Department of Environmental Protection, will host a workshop followed by a public hearing to address the creation of an Erosion Control Line along the upcoming 2.8 mile Army Corps of Engineers project within the city limits of Flagler Beach. State law

2 minutes read
  • LinkedIn
  • X
  • Email

Flagler County, in coordination with the Florida Department of Environmental Protection, will host a workshop followed by a public hearing to address the creation of an Erosion Control Line along the upcoming 2.8 mile Army Corps of Engineers project within the city limits of Flagler Beach.

State law requires the establishment of an Erosion Control Line before the construction of a beach renourishment project that places sand seaward of the Mean High Water Line (average of the high water elevation over a period of time), such as with the Army Corps project – scheduled to begin in May 2020 between South 6th and South 28th streets.

“This sand placement will be the initial construction of the federal shore protection project that will slightly widen and subsequently maintain the existing beach and dunes conditions,” said County Engineer Faith Alkhatib.

The Erosion Control Line in this instance will be established at the Mean High Water Line as surveyed in July 2019. It will fix the boundary between the upland property owners – regardless of future beach erosion or accretion – and the submerged land owned by the State of Florida.

“ Staff from the Florida Department of Environmental Protection, the Army Corps of Engineers, and I will be at the meeting to explain the Erosion Control Line, answer questions, and take public comments,” Alkhatib said. “Maps of the Erosion Control Line will be available at the workshop and public hearing.”

The workshop and public hearing will be held from 6 to 7:30 p.m. on October 22 in the Commission Chambers of the Government Services Building, 1769 E. Moody Boulevard, Bunnell, FL.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  2. 2Lyttelton Port gears up for its largest expansion project
  3. 3Isle of Palms wraps up first phase of beach renourishment
  4. 4Conneaut Harbor dredging kicks off

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free