DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Miami Harbor Navigation Project Available for Comment
Business & Finance

July 18, 2019 · about 7 years ago

Miami Harbor Navigation Project Available for Comment

The U.S. Army Corps of Engineers has announced a draft environmental assessment and proposed finding of no significant impact for the operation and maintenance dredging and dredged material placement for the Miami Harbor Navigation Project inner harbor, Miami-Dade County. As USACE reported, the purp

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers has announced a draft environmental assessment and proposed finding of no significant impact for the operation and maintenance dredging and dredged material placement for the Miami Harbor Navigation Project inner harbor, Miami-Dade County.

As USACE reported, the purpose of harbor dredging maintenance is to enable safe and efficient vessel navigation through federal channels.

The accumulation of sediment, commonly referred to as shoaling, in the harbor has reduced depths and widths, hindering safe and efficient navigation.

Periodic dredging is required to remove these sediments and maintain the channel at its federally authorized dimensions.

The Corps surveyed existing conditions and considered the current maintenance needs, if any. Based on survey results, the Corps concludes that only the inner harbor cuts of the Miami Harbor project warrant maintenance dredging at this time.

The Preferred Alternative consists of dredging approximately 100,000 cubic yards of shoaled material from within the inner harbor to maintain authorized dimensions. Dredged material will be placed in the Miami Ocean Dredged Material Disposal Site.

Details on the Preferred Alternative can be found in the draft environmental assessment (EA). The draft EA, associated appendices, and proposed finding of no significant impact are available for review here .

The draft information is available for public comment up until August 19, 2019.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42
  2. 2Straatman: New female bow coupling for Jan de Nul
  3. 3Pilbara Ports: Eastern Harbor Revetment Project completes
  4. 4BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free