DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kissimmee River Restoration Project Progresses
Business & Finance

June 27, 2018 · about 8 years ago

Kissimmee River Restoration Project Progresses

The Kissimmee River Restoration project, one of the many ongoing projects currently underway by the U.S. Army Corps of Engineers in partnership with the South Florida Water Management District, aimed to restore America’s Everglades, is moving ahead. The U.S. Army Corps of Engineers’ Jacksonville Dis

2 minutes read
  • LinkedIn
  • X
  • Email

The Kissimmee River Restoration project, one of the many ongoing projects currently underway by the U.S. Army Corps of Engineers in partnership with the South Florida Water Management District, aimed to restore America’s Everglades, is moving ahead.

The U.S. Army Corps of Engineers’ Jacksonville District said in its latest announcement that they are advising boaters to use extreme caution when navigating in the Kissimmee River Restoration Project Area near the C-38 Canal to the east of Hidden Acres Estates.

Draft depths are extremely shallow in the area causing it to be non-navigable by most vessels.

“We are working to address this issue as soon as possible ,” said Trisston Brown, Corps of Engineers senior project manager .

During 2017’s Hurricane Irma, a large volume of spoil material from Reach 3 of the Kissimmee River Restoration Project was washed into the remnant channel near the C-38 canal. Investigative surveys are scheduled and a construction contract to remedy the shoaling issue will begin shortly after surveys are completed.

Once completed, the Kissimmee River Restoration project will restore the channelized river back to its natural meandering pattern and provide 130,000 acre-feet of natural floodplain storage.

This will slow the flow of water from the Kissimmee Basin into Lake Okeechobee, thereby slowing down the rise in the lake that often results in high-volume discharges to the Caloosahatchee and St. Lucie estuaries, said USACE.

To date, continuous flow has been restored to 28 miles of the Kissimmee River.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Straatman: New female bow coupling for Jan de Nul
  2. 2Pilbara Ports: Eastern Harbor Revetment Project completes
  3. 3BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  4. 4USACE completes West Harbor dredging project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free