DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Schuyler Flood Risk Management Project
Business & Finance

March 23, 2016 · about 10 years ago

Schuyler Flood Risk Management Project

The city of Schuyler, the Lower Platte North Natural Resources District, and the U.S. Army Corps of Engineers, Omaha District, partnered on a project to reduce flood risks to the city of Schuyler, Nebraska. Schuyler, the county seat for Colfax County, is subject to flooding from three major sources

2 minutes read
  • LinkedIn
  • X
  • Email

The city of Schuyler, the Lower Platte North Natural Resources District, and the U.S. Army Corps of Engineers, Omaha District, partnered on a project to reduce flood risks to the city of Schuyler, Nebraska.

Schuyler, the county seat for Colfax County, is subject to flooding from three major sources of water – Shell Creek, Lost Creek and the Platte River.

Shell Creek, a tributary to the Platte River, lies to the north and east of Schuyler. Lost Creek, a minor tributary of the Platte River, runs along the southern edge of the community. The Platte River is located 1.5 miles south of the city.

In 2011, the Omaha District completed a feasibility study which identified an economically feasible project consisting of two levee systems, one to protect against Shell Creek flooding and another along the south side of the city to protect it from Platte River flooding.

This project is being conducted in two phases. Phase 1 consisted of a new 2.2-mile levee constructed north and east of Schuyler to address flood threats posed by Shell Creek. Phase 2 involves construction of a new levee, approximately 2.5 miles long, south and west of Schuyler to address flood threats from the Platte River.

The total project (Phase 1 and 2) will reduce most of Schuyler’s flood risks from the 100-year flood and reduce annual flood damages by approximately $1,900,000.

A construction contract for the Shell Creek levee (Phase 1) was awarded in September 2013 to TJC Engineering, Inc. of Louisville, Kentucky for a total of $3.5 million. A groundbreaking ceremony with the project sponsors occurred in March of 2014, and a ribbon cutting ceremony commemorated completion of the project in May 2015.

Final construction of the levee and additional major features was completed in October 2015. Additional grading and culvert work to improve drainage near the west end of the levee was completed in March 2016. Seeding of recently graded soil will follow as weather permits this spring.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Kazakhstan, Jan De Nul discusses cooperation perspectives, spotlight on dredging
  2. 2Greatham North East flood alleviation scheme gets OK
  3. 3Gator Dredging nabs Banana River dredging deal
  4. 4EXCLUSIVE: Doca dos Bacalhoeiros dredging kicks off

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free