DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Record for Port of Palm Beach
Business & Finance

July 21, 2015 · about 11 years ago

Record for Port of Palm Beach

Slip Three, the Port of Palm Beach southernmost slip, underwent major renovations recently including increased depth of 35 feet (from 33’) and a northward shift of approximately 10 feet. The improvement will allow vessels to fully load without waiting on a rising tide. While the slip was still under

1 minutes read
  • LinkedIn
  • X
  • Email

Slip Three, the Port of Palm Beach southernmost slip, underwent major renovations recently including increased depth of 35 feet (from 33’) and a northward shift of approximately 10 feet.

The improvement will allow vessels to fully load without waiting on a rising tide.

While the slip was still under construction, the Louis Howland was able to dock and load a record 16,700 short tons of sugar, allowing record cargo capabilities for Florida sugar and molasses exchange. This is just one of the examples how dredging and port development can be stimulus for both the local and state economies.

Last year, the Army Corp of Engineers has signed its Chief’s Report; giving the Corp’s final approval of a dredging project to the Lake Worth Inlet and areas around the Port of Palm Beach. The dredging project calls for the width of the outer channel of the Lake Worth Inlet to increase from 400 ft. to 450 ft., the inner channel width to increase from 300 up to 450 ft. at its widest area, and the depth of the channel to increase from 35 to 39 ft.

The project is expected to cost $88.6 million, of which the Port of Palm Beach will pay $35 million.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1E-touch Dredgers: Work on new TSHD progresses steadily
  2. 2USACE begins Lower Charleston Harbor maintenance dredging
  3. 3London Gateway Berth 5 expansion: Dredging campaign underway
  4. 4University of Southern Denmark: New project to restore polluted lakes

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free