DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Deep Excavation System from Van Oord
Business & Finance

May 5, 2015 · about 11 years ago

Deep Excavation System from Van Oord

Over the past few years, Van Oord has developed a new technique for dredging at great water depths. This Deep Excavation System (DES), patented by Van Oord, is an innovative method to prepare a sea bottom profile for installing offshore pipelines. Uneven sea beds are traditionally prepared for layin

2 minutes read
  • LinkedIn
  • X
  • Email

Over the past few years, Van Oord has developed a new technique for dredging at great water depths.

This Deep Excavation System (DES), patented by Van Oord, is an innovative method to prepare a sea bottom profile for installing offshore pipelines.

Uneven sea beds are traditionally prepared for laying offshore pipelines by installing large volumes of rock. As an alternative to this Subsea Rock Installation (SRI) method, Van Oord has applied the Deep Excavation System in Australia and Norway.

On these projects, excavating several thousand cubic meters of hard and soft soil made the installation of hundreds of thousand tonnes of rock unnecessary. Combining the excavating system and SRI can be a cost-effective solution for sea bed preparation.

“Nowadays, oil and gas are being extracted more and more from isolated fields in deep water and transported over long distances. Our clients face these challenges. To meet their needs, we offer tailor-made solutions by applying our marine ingenuity. The Deep Excavation System is an example of this and a valuable addition to our complete package of offshore services, ” said Joep Athmer, Managing Director of Van Oord Offshore.

The Deep Excavation System allows dredging to take place at depths varying from 100 to at least 1,000 m. Van Oord’s flexible fall pipe vessels Stornes and Bravenes (operational in 2016) can be equipped with this system, which has been developed in-house.

It consists of the combined application of a sophisticated grab and a Fall Pipe Remotely Operated Vehicle (FPROV). The DES has a very accurate position control system and generates only very limited turbidity, which is vital in view of potential nearby sensitive marine environment like coral.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Skanska builds new homeport pier at Naval Station Newport
  2. 2Ecocoast, Xylem partnership strengthens turbidity monitoring for GCC dredging projects
  3. 3Seaward Marine wins $15.2M Virginia Beach contract
  4. 4BREAKING NEWS: Renewed Afsluitdijk opens, Van Oord says

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free