DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›J.E. McAmis Wins West Coast Jetty Project
Business & Finance

April 21, 2015 · about 11 years ago

J.E. McAmis Wins West Coast Jetty Project

J.E. McAmis of Chico, CA has won contract from the U.S. Army Corps of Engineers, Portland District, to place more than 52,000 tons of new jetty stone on the North Jetty at the Mouth of the Columbia River. The Mouth of the Columbia River North and South Jetties are situated along a stretch of ocean [

1 minutes read
  • LinkedIn
  • X
  • Email

J.E. McAmis of Chico, CA has won contract from the U.S. Army Corps of Engineers, Portland District, to place more than 52,000 tons of new jetty stone on the North Jetty at the Mouth of the Columbia River.

The Mouth of the Columbia River North and South Jetties are situated along a stretch of ocean known as the “Graveyard of the Pacific.” This stretch of coast is known for unpredictable weather, strong currents and big seas which have claimed more than 2000 vessels and 700 lives at the entrance of the Columbia River alone.

The North Jetty was constructed between 1912 and 1917, with the last repairs to J.E. McAmis’ contract area occurring in 1939 and 1965. The outer portion of the jetty has experienced significant damage from winter storms resulting not only in loss of jetty length, but also to a narrowing and lowering of the jetty side slopes and crest section starting just offshore and extending to the current end of the jetty.

J.E. McAmis’ repair work includes reworking of existing stone up to 45 tons in size and placement of new jetty stones up to 27 tons in size. J.E. McAmis representative, Scott Vandegrift indicates that J.E. McAmis will utilize a combination of lattice boom cranes and large hydraulic excavators in completing work, which he says will be wrapped up by September of this year.

[mappress mapid=”20341″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Bahrain plans major land reclamation at Khalifa Port
  2. 2Precision dredging at Newton Ferrers by TMS
  3. 3Two months to go: get your ticket for OEEC 2026
  4. 4PHOTO OF THE DAY: Dredge Potter returns for 2026 dredging season

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free