DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Study to Evaluate Lynnhaven River Ecosystem Restoration (USA)
Business & Finance

January 29, 2014 · about 12 years ago

New Study to Evaluate Lynnhaven River Ecosystem Restoration (USA)

A feasibility report and integrated environmental assessment, or EA, have been prepared to describe the findings of the Lynnhaven River basin ecosystem restoration study and to assess the potential impacts of the project on the Lynnhaven River basin and surrounding area. The purpose of the study was

1 minutes read
  • LinkedIn
  • X
  • Email

A feasibility report and integrated environmental assessment, or EA, have been prepared to describe the findings of the Lynnhaven River basin ecosystem restoration study and to assess the potential impacts of the project on the Lynnhaven River basin and surrounding area.

The purpose of the study was to evaluate ecosystem restoration within the Lynnhaven River basin and to develop the most suitable restoration plan.

The plan that resulted from this study includes the restoration of approximately 38 acres of wetlands and the planting of 94 acres of sea grasses, also called submerged aquatic vegetation, or SAV. The study also recommends the reintroduction of bay scallops in 22 acres of the Lynnhaven River once sea grass becomes established in the river basin.

The last element of the plan includes the construction of 31 acres of hard-reef habitat.

In compliance with the National Environmental Policy Act, the feasibility report and integrated EA must be available to the public in the affected area for 30 days for review and comment. The public comment period will begin on April 26 and end on May 26, 2013.

[mappress]

Press Release, January 30, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Bahrain plans major land reclamation at Khalifa Port
  2. 2Precision dredging at Newton Ferrers by TMS
  3. 3Two months to go: get your ticket for OEEC 2026
  4. 4PHOTO OF THE DAY: Dredge Potter returns for 2026 dredging season

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free