Everglade detail page

Everglade
Hall Contracting Pty Ltd.
Image of Everglade
  • Total installed power:
    1,200hp
  • Minimal dredging depth:
    1.50m
  • Maximal dredging depth:
    15m
  • Cutter power:
    270hp
  • Diameter suction pipe:
    400mm
  • Diameter discharge pipe:
    400mm
More vessels by operator Hall Contracting Pty Ltd.
More vessels by builder