
With the successful installation of the 23rd and final caisson by TM Edison, the consortium including DEME, the foundation works for the Princess Elisabeth Island are now complete. DEME is executing this project for Elia as part of TM EDISON, together with Jan De Nul. The 23 concrete caissons, each

AYK Energy and Gebhard Electro are strengthening their collaboration by striking a new deal to electrify two workboats. The first project is the construction of a new trailing suction hopper dredger (TSHD1000) at Damen Shipyards in the Netherlands for UK Dredging, part of Associated British Ports. T

The following is a press release from Navingo BV, the owner of Dredging Today and organizer of the annual Offshore Energy Exhibition & Conference (OEEC). More than 400 exhibitors and co-exhibitors booked their spots at OEEC 2024 Businesses and organizations from across the offshore energy sector and

The Belgian Minister of Energy, Tinne Van der Straeten, visited the large-scale model of the Princess Elisabeth Island yesterday at DHI’s wave pool lab in Hørsholm, Denmark. Measuring 8 metres in length and 3 metres in width, the model is one of the largest ever tested in DHI’s wave basins, and it i