Dredging underway at Clinton Town Marina

Dredging

Work is underway on the Clinton Town Marina Dredging and Boat Ramp Replacement Project in Connecticut.

Photo courtesy of the Town of Clinton

The dredging of the marina is one year behind schedule. Usually, dredging occurs on a five to seven-year cycle depending upon a variety of factors.

As a result, approximately 25% of the slips are now either out of the water or the water level is so low the slips can’t be rented or must be rented at a reduced rate.

The Town Marina located on Riverside Drive provides the residents of Clinton with direct access to the harbor.

The Marina is staffed and maintained by the Town and has undergone several major projects in the past ten years including a new bulkhead and deck improvements.